dA (Bz) CNA CPG
CPG for incorporation of unmodified dA at 3' end of an oligonucleotide.
Did you mean: WA 059 370 0824 Jasa delrin Rumah Minimalis yale Ada Tokonya Berpengalaman Ngawen Gunungkidul?
CPG for incorporation of unmodified dA at 3' end of an oligonucleotide.
192ABI - 50L Waste Tank
M6 and M12 Lee Valve Waste Assembly
50L SS Waste tank with tank full sensor, manual valves for manual waste removal, before or after synthesis
50L SS Waste tank with tank full sensor, manual valves for manual waste removal, before or after synthesis
50L SS Waste tank with tank full sensor, manual valves for manual waste removal, before or after synthesis
1/16" OD x 0.030" ID x 24", pre-cut Teflon tubing with Upchurch fittings.
1/16" OD x 0.020" ID x 24", pre-cut Teflon tubing with Upchurch fittings.
1/16" OD x 0.030" ID x 48 ", pre-cut Teflon tubing with Lee valve fittings.
1/16" OD x 0.020" ID x 48 ", pre-cut Teflon tubing with Lee valve fittings.
| Europe, Middle East, and Africa | |
|---|---|
| UK | +44 1992 470 757 |
| Germany | +49 30 1663 54600 |
| North America, Latin America | |
| Wisconsin, USA | +1 888 575 9695 |
| Asia Pacific | |
| China | +8621-22509000 |
| Singapore | +65 6734 4800 |